News

News

A geotechnical pot of gold at the end of the rainbow

As geotechnical engineers, CampbellReith designed, procured, and interpreted an intertidal ground investigation in the River Thames.

5 December 2019

Harrison Group Environmental was the pot of gold at the end of the rainbow after successfully undertaking the ground investigation without losing any of their equipment in the rapidly rising tide!

As geotechnical engineers, CampbellReith designed, procured, and interpreted an intertidal ground investigation in the River Thames. The investigation was required to inform the design of a new footbridge set to be installed under Barnes Rail Bridge.