West Medina Mills covers an area of 4.3 ha and lies in a sensitive location directly adjacent to both the River Medina and Ramsar site. →
CampbellReith carried out design and construction monitoring of the new North East Bexhill Gateway road – connecting Wrestwood Road in North Bexhill and the new Bexhill to Hastings Link Road. →
Pump House No.5 is Kent’s first distillery producing a range of spirits – premium vodka, gin and whisky. The building is a Grade II Victorian pump house which was used to pump water out of the dry docks. →
CampbellReith was appointed to assist in securing planning consent for an 11.5 ha development site: a mixture of shops and leisure. →